Management System - Company Ranking(45 companies in total)
Last Updated: Aggregation Period:Jan 21, 2026〜Feb 17, 2026
This ranking is based on the number of page views on our site.
Display Company Information
| Company Name | Featured Products | ||
|---|---|---|---|
| Product Image, Product Name, Price Range | overview | Application/Performance example | |
| 【Functions (Partial)】 - Display only the pile center position - Automatic screenshot function - Depth management - Alarm settings 【Applicat... | 【Applications】 - Pre-made piles (steel pipe piles / PC piles) - Construction (vibro / all-casing) - Foundation work for bridges, ports, emba... | ||
| 【Measurable by One Person】 By measuring the reflective sheet with a total station and obtaining three-dimensional coordinate data, work ca... | Contributing when there is a shortage of manpower at the steel frame construction site. | ||
| 【Visual Display with Mesh】 Measure your location (position of the prism) against the design values and display the height of the concrete be... | - Leveling work with a trowel during pouring - Measuring the height of the concrete during pouring | ||
|
---
--- |
--- | ||
-
- Featured Products
-
Pile Driving Management System [Pile Navi Cloud-V]
- overview
- 【Functions (Partial)】 - Display only the pile center position - Automatic screenshot function - Depth management - Alarm settings 【Applicat...
- Application/Performance example
- 【Applications】 - Pre-made piles (steel pipe piles / PC piles) - Construction (vibro / all-casing) - Foundation work for bridges, ports, emba...
Steel Frame Construction Management System [Archipoint Cloud]
- overview
- 【Measurable by One Person】 By measuring the reflective sheet with a total station and obtaining three-dimensional coordinate data, work ca...
- Application/Performance example
- Contributing when there is a shortage of manpower at the steel frame construction site.
Concrete Placement Top Surface Finish Height Management System [Kotepri]
- overview
- 【Visual Display with Mesh】 Measure your location (position of the prism) against the design values and display the height of the concrete be...
- Application/Performance example
- - Leveling work with a trowel during pouring - Measuring the height of the concrete during pouring
-
Membership (free) is required to view all content.
Already a Member? Log In Here
計測ネットサービス